Florence JR/SR High School
Track and Field Replacment

CLIENT: Fremont Re-2 School District

PROJECT: Florence JR/SR High School Track

SUB-PROJECT OF: Fremont RE-2 2022 Bond Projects

PUBLIC/PRIVATE PROJECT: Public Project

MARKET SECTOR: Educational

BUILDING CLASSIFICATION: Athletic Fields -- K-12 Education

PROJECT COST: $3,480,424.00

DELIVERY METHOD: Design Build

Florence JR/SR High School Track – Fremont RE-2 School District

As part of the Fremont RE-2 2022 Bond Projects, iiCON Construction and CSNA Architects were selected to lead the reconstruction of the track and field at Florence JR/SR High School. The original facility, which had suffered from long-term settlement issues, had been unusable for nearly two decades. Our team partnered with the district to completely remove the existing surface and over-excavated the subgrade eight feet to install structural fill, correcting underlying soil conditions. The new facility includes a synthetic turf field, improved drainage systems, a rebuilt retaining wall, and efficient LED lighting to replace outdated fixtures. This revitalized track and field enhances safety and usability for students and the broader community.

Related Articles